Herunterladen Inhalt Inhalt Diese Seite drucken

R+F OPTILINE Einbau- Und Betriebsanleitung Für Fachpersonal Seite 20

Übergabestation / pumpenstrang
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

The installation and operating instructions that come
with the pump, controller and station have to be read
in their entirety before installation and initial operation.
The instructions have to remain with the user of the
system. Claims of any kind due to damages caused
by the nonobservance of the instructions or incorrect
use cannot be accepted.
Power
supply 230V
N
PE
Illustr. 6.2 General information regarding assignment
Illustr. 6.3 Connecting cable high-efficiency pump
(example for Wilo pumps)
20
Control line
blue = GND (earth)
brown = signal output
(PWM or 0-10V)
6.3 Installation
1. Pull off the front insulation (3) and remove the
solar station / pump circuit (1) from the rear
insulation (4).
3
Illustr. 6.4 Pump circuit
3
1
Illustr. 6.5 Transmission station
2. For wall attachment, drill two 8 mm holes at a
distance of 262 mm (for pump length 130 mm) or
312 mm (for pump length 180 mm) and insert the
enclosed dowels into the bores. Use rear insulation
(4) as drilling jig.
Illustr. 6.6 Fixing of the wall brackets
1
5
5
2
4
5
1
5
2
Type 13 = 262 mm
Type 18 = 312 mm
Inhaltsverzeichnis
loading

Inhaltsverzeichnis