Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Safety Instructions; Maintenance Work; Functional Check - Steelcase Moby2 Kurzanleitung

Vorschau ausblenden Andere Handbücher für Moby2:
Inhaltsverzeichnis

5 Maintenance

5
Maintenance

5.1 Safety instructions

Only appropriately qualified and authorised
personnel may carry out maintenance and repair
work.

5.2 Maintenance work

5.2.1 Functional check

Carry out the specified functional check and complete any
resulting maintenance work.
The components of the Moby2 product should be checked for
EN
correct functioning at regular intervals.
NOTE
Using unapproved spare parts may cause
damage to the product.
Interval
Regularly
12
}
Only components provided by Steelcase may be used
as spare parts. The installation of other parts must be
agreed upon with Steelcase.
Inspection
point
Drawers and flap
door
Roller door
Functional
Required
check
condition
Position and
Drawers and flap
running
door operate
capability
perfectly
Position and
Roller door runs
running
properly
Measures (if
necessary)
Adjust the
hinges and
rail at right
angles and
tighten the
screws.
Check the rail
or roller door
Inhaltsverzeichnis
loading

Inhaltsverzeichnis