OVERHEAD RIGGING
 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
 Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
 Make sure that the chain used to hang the mirror ball can hold at least 12times the weight of the mirror
ball. The length of the chain must never exceed 100cm.
 If you use a mirror ball motor, make sure to use an appropriate motor that can hold the weight of the mirror
ball.
 In order to have a safe installation, you MUST follow the installation instructions supplied with the mirror
ball.
 Make sure the rotation of the mirror ball is never slowed down or stopped by surrounding materials.
 The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
MAINTENANCE
 Make sure the area below the installation place is free from unwanted persons during servicing.
During inspection the following points should be checked:
 All screws used for installing the device and any of its parts should be tightly fastened and may not be
corroded.
 Housings, fixations and installations spots (ceiling, truss, suspensions) should be totally free from any
deformation.
 When an optical mirror is visibly damaged due to cracks or deep scratches, it must be replaced.
 The cleaning of the optical mirrors must be carried out periodically to optimize light output. Cleaning
frequency depends on the environment in which the fixture operates: damp, smoky or particularly dirty
surroundings can cause greater accumulation of dirt on the unit's optics.
 Clean with a soft cloth using normal glass cleaning products.
 Always dry the parts carefully.
 Clean the mirrors at least every 90 days.
SPECIFICATIONS
MB10 – 10cm Mirror ball:
Mirror size:
Diameter:
Weight:
MB20 – 20cm Mirror ball:
Mirror size:
Diameter:
Weight:
You can download the latest version of this user manual on our website: www.jb-systems.eu
JB SYSTEMS
®
Every information is subject to change without prior notice
7mm x 7mm
10cm
+/-180g
10mm x 10mm
20cm
+/-1kg
2/12
MIRROR BALL 10CM + 20CM
OPERATION MANUAL

Werbung

loading

Diese Anleitung auch für:

Mirror ball mb20B02027B02022