Herunterladen Inhalt Inhalt Diese Seite drucken

Leister IGNITER BM2 Bedienungsanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
Operating Instructions
Please read operating instructions carefully before use
and keep for future referen
Leister IGNITER
Hot-air blower
Application
Built-in unit for pellet and wood chip heaters
Warning
Caution
230
400
(Translation of the original operating instructions)
Opening the device is extremely dangerous, since live parts and connections are
exposed. The device must be fully disconnected from the mains before opening it.
Caution: external voltage.
Danger of fire and explosion if hot-air welding devices are used incorrectly,
especially in the vicinity of flammable materials and explosive gases.
Danger – can cause burns! Do not touch the heating element tube when
hot.Allow the device to cool down.
Do not direct hot-air stream towards people or animals.
The nominal voltage indicated on the device must correspond to the mains voltage.
The device must be monitored during operation. Heat can reach combustible
materials which are out of sight.
The device may only be used by trained personnel or under their supervision.
Children may not use the device under any circumstances.
Keep away from wet and damp areas.
Heating element tube
Electrical connections
Hose connection
Inner thread
Assembly support area
GB
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Leister IGNITER BM2

Diese Anleitung auch für:

Igniter bm4

Inhaltsverzeichnis