Herunterladen Diese Seite drucken

Gigahertz Solutions ME 3851A Bedienungsanleitung Seite 21

Vorschau ausblenden Andere Handbücher für ME 3851A:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Possibilities of Remediation
If possible, increase the distance to the source
of pollution
Correct "Plugging":
Switch the meter to "E" and place it between e.g.
the
bedside light
light. Reverse direction of plug by 180° and re-
insert it. Logical: leave plug in the direction
of lowest readings. This trick works best for an
inline cable-switch of e.g. the lamp.
Use shielded socket-lines with two pole switch
and
shielded
connection
versions check our website).
Install an automated "demand switch" in the house
fuse box which cuts out electricity as soon as
the last load is switched off and automatically
reconnects
as
soon
again. As long as everything is switched off,
there is no tension on the line and hence no pol-
lution in the room. This is the most comfortable
and
effective
www.gigahertz-solutions.com
cated and well reputed models.
It's easy to check for yourself whether a demand
switch is a good investment for you (easiest in
pairs):
 One person reads the meter on the bed to be
inspected. Switch the meter to "E".
 The
other
person
fuses (one by one and different combinations)
 Install the demand switch into those circuits
which
show
the
strength.
Further hints, literature and contact informa-
tion
regarding
gists" can be found on our website.
© Gigahertz Solutions GmbH
and
the
pillow.
cables
as
electricity
measure
you
can
for
switches
off
highest
reduction
professional
"building
M a d e in G e r m a n y
Switch off
(for
available
is
needed
take.
Check
most
sophisti-
the
relevant
of
field
biolo-
19

Werbung

loading

Diese Anleitung auch für:

Me 3951a