Herunterladen Inhalt Inhalt Diese Seite drucken

Operations; Notice Before Using; Operation Instructions - Teddington Inoa Installations- Und Benutzerhandbuch

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

2. Operations

2.1. Notice before using

For longer service life, please ensure water pump on before heat pump on, and water
pump off after heat pump off.
② Ensure no water leakage on piping system, then unlock screen and press
power on heat pump.

2.2. Operation instructions

Symbol
Note:
ƒ [ Screen lock:
a. If no operation in 30 seconds, screen will be locked.
b. When HP is off, screen will be dark and "0%" will be displayed.
Designation
ON/OFF
Power On/Off
Unlock
Press it for 3 seconds to unlock/lock screen
Speed
Select Smart/Silence mode
Up / Down
Adjust set temperature
Function
- 4 -
For users
to
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Inoa 06Inoa 08Inoa 12Inoa 14Inoa 18

Inhaltsverzeichnis