Herunterladen Diese Seite drucken

Zeck Audio STAC Vision 1.5 Bedienungsanleitung Seite 9

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Vision 1.5
Slave
Remote Control
Footswitch
8.
The fog generator is equipped with an automatic fluid-level control. If the fluid level falls below
its minimum allowed value, the sypply voltage for the fog liquid pump is automatically inter-
rupted, wich is indicated by the red indikator lamp on the unit´s back panel.
For refilling of the tank with original STAC
remove the hose from the tank by applying soft pressure to the orange-colored ring at the cap´s
hose conduit. Screw off the tank cap and remove the induction pipe including the level sensor.
The intake side off the induction pipe carries a filter which shuold be checked for dirt. After refil-
ling the tank, reassemble all parts in reverse order. The unit is now ready for operation again.
9.
Do not open unit or connectors unless you are an authorized STAC
company is not responsible for any damage resulting from disregarding this warning.
10.
This unit must be earthed through the protective-earth contact on the three-pong mains
connector.
11.
Replacement fuse must have exact specifications as stated on the unit identification label.
Have a lot of fun and success with your STAC
See for technical specifications on page 13
owner`s manual Stac Vision 1.5 © Zeck Audio
All manuals and user guides at all-guides.com
owner`s manual
®
Fuse
Power
fog liquid, pull the plug from the level sensor and
®
®
Vision 1.5
Slave
Remote Control
Footswitch
®
service person. The STAC
®
9

Werbung

loading

Verwandte Produkte für Zeck Audio STAC Vision 1.5