WARNING: BEFORE DOING ANY WORK ON THE PUMP, ALWAYS FIRST DISCONNECT THE
I
ATTENTION: PRODUCT INTENDED FOR PROFESSIONAL USE BY SKILLED PERSONNEL.
I
WARNING: WE RECOMMEND INSTALLING THE PUMP IN A VERTICAL POSITION TO ENSURE
I
ATTENTION: MAINTENANCE WORK ON THE PUMP MUST BE CARRIED OUT BY AUTHORISED AND
H
SO
SULPHURIC ACID All the pumps are tested with water. Before dosing chemical products that may react
-
2
4
with water, dry all the internal parts of the plumbing thoroughly.
-
Install the pump in a zone where the environment temperature does not exceed 40ºC and the relative humidity is below
90%. The pump has an IP65 protection level. Avoid installing the pump directly exposed to sunlight.
-
Install the pump so that any inspection and maintenance operations are easy to carry out, then secure the pump firmly in
order to prevent excessive vibrations.
-
Check that the power supply available in the network is compatible with that indicated on the pump label.
WIRING
F
EM00136454
READ THE FOLLOWING WARNINGS BEFORE INSTALLING
OR PERFORMING MAINTENANCE ON THE PUMP.
POWER SUPPLY CABLE.
PROPER OPERATION.
TRAINED PERSONNEL ONLY.
1 2 3 4 5 6
Input A = Power
supply100 - 240 Vac
(50-60 Hz) or
24Vac/dc
Input B =
Level control probe
input
1
2
Not used.
3
4
5
Level control probe input
(Dry contact: on-off)
6
Fuse: 2A (100 ÷ 240 Vac) / 3,15 (24V); 250V; T
F
5x20
rev.1.0
EN
The pump must be connected to a
power supply that complies with the
information indicated on the label on
the side of the pump. Failure to
respect these limits may cause
damage to the pump itself.
The pumps have been designed to
absorb small over voltages.
Therefore, in order to prevent the
pump from being damaged, it is
always preferable to ensure that the
pump does not have a power source
shared with electrical appliances that
generate high voltages.
Connection with the three-phase
380V line should only be made
between phase and neutral.
Connections MUST NOT be made