Herunterladen Inhalt Inhalt Diese Seite drucken

Operational Procedures; Operating Your Rg5410A-E - Promax Rg5410A-E Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für RG5410A-E:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24
Advanced Test Products

OPERATING YOUR RG5410A-E

Connect your RG5410A-E to a 230 V outlet. Switch the main power switch to the ON
position. You should hear the fan running. Press the compressor start switch. This
"momentary" switch will start the compressor. It may be necessary, under certain
circumstances, to press this switch more than once to start the compressor.

OPERATIONAL PROCEDURES

SELF PURGE / AUTO EVACUATE
NOTE:
To change from Recovery mode to Purge:
Close the Input port, turn the unit off (to prevent high pressure shutoff),
switch to Purge position and restart the unit.
NORMAL RECOVERY
Do not turn this valve
while unit is running.
Do not turn this valve
while unit is running.
4
Close input valve, turn
machine off, switch to
SENSOR
Purge position and re-
SELECT
start machine.
Close input valve, turn
machine off, switch to
Purge position and re-
SENSOR
start machine.
SELECT
RG5410A-E
ON
VAC
OFF
ON
VAC
OFF
Inhaltsverzeichnis
loading

Inhaltsverzeichnis