The brake system of the hoist is adjusted in the factory. The rubber of the brake system will
worn out and result in the brake function out of the way because of a long time work. In order
to insure the safety work, the manufacturer recommends that if the electric hoist is in the
rated load work condition, you should change the frictional slice on the transit position when
the dropping distance is bigger than 1% distance of rising 1 minute.
- The electric hoist is installed with the up limited position and the low limited position brake
system.
The up limited position means the limited position switch will be flicked after the goods touch
the limited position frame when the goods lift to the definite height. So the machine stops
working.
The low limited position means that the limited position switch will be flicked after the goods
drop to the limited position, and the machine also stops working. And it installs beside the
machine.
- There must be at least 2 circles of the wire rope in the spool when the low limited position
switch triggers. Otherwise, it is out of adjustment and you should adjust it in the local dealer.
- Please ensure to check the units which are easy to worn out mentioned above and you
should change them each half year, to ensure the safety of the operator and the machine.
- Periodically check if the steel cable is in good conditions.
Note: Abrasion of the steel cable
Check abrasion of the steel cable, if the wear/abrasion area exceeds
10% of the original size; replace the steel cable with a new one.
- Check if the screws securing the brackets and reduction gear are tight
well.
- Check if the conditions and tightening of the nuts securing the steel
cable clamps.
- Periodically check if all the switches (e.g. motor cut-off switch, push
button switch) are in good operating conditions

TECHNICAL DATA

Reference
Reference
Load Capacity
Lifting height
Lifting speed
Cable length
Cable diameter
Resist cable
Service
Main voltage
Motor Performance
Reference
Reference
Load Capacity
Lifting height
Lifting speed
Cable length
Cable diameter
Resist cable
Service
Main voltage
Motor Performance
PE100/200PT
version
Standard
with double
version
load
100kg
200kg
12m
6m
10m/min
5m/min
12.5 m
3 mm
≥800kg
S3 20%-10 min
230V~50Hz
P1 480W
PE250/500C
version
Standard
with double
version
load
250kg
500kg
18m
9m
8m/min
4m/min
18 m
4.2 mm
≥1250kg
S3 25%-10 min
230V~50Hz
P1 900 W
PE125/250C
version
Standard
with double
version
load
125kg
250kg
18m
9m
8m/min
4m/min
18 m
3 mm
≥750kg
S3 20%-10 min
230V~50Hz
P1 500W
PE300/600C
version
Standard
with double
version
load
300kg
600kg
18m
9m
8m/min
4m/min
18 m
4.5 mm
≥1500kg
S3 20%-10 min
230V~50Hz
P1 1050 W
PE200/400C
version
Standard
with double
version
load
200kg
400kg
18m
9m
8m/min
4m/min
18 m
3.8 mm
≥1000kg
S3 25%-10 min
230V~50Hz
P1 750 W
PE495/990C
version
Standard
with double
version
load
500kg
999kg
12m
6m
8m/min
4m/min
12 m
5.6 mm
≥2000kg
S3 25%-10 min
230V~50Hz
P1 1600 W