Herunterladen Inhalt Inhalt Diese Seite drucken

Daikin FTXC20BV1B Bedienungshandbuch Seite 29

Handgerät drahtlos
Vorschau ausblenden Andere Handbücher für FTXC20BV1B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 59
How to open Front Panel
1. Open the front panel.
• Hold the panel at the recesses on the main
unit (2 recesses on right and left sides) and
lift it until it stops.
2. Remove the front panel.
• While lifting the front panel further, slide it
to the right and pull it to the front side. The
left rotating shaft is detached. Slide the right
rotating shaft to the left and pull it to the front
side to remove it.
3. Attach the front panel.
• Align the right and left rotating shafts of the
front panel with the grooves and push them
all the way in.
• Gently close the front panel. (Push both
ends and the center on the front panel.)
• Don't touch the metal parts of the indoor unit. It may cause an injury.
• When removing or attaching the front panel, support the panel securely with hand to prevent
it from falling.
• For cleansing, do not use hot water above 40°C, benzene, gasoline, thinner, nor other
volatile oils, polishing compound, scrubbing brushes, nor other hand stuff.
• After cleaning, make sure that the front panel is securely fixed.
When The Unit Is Not To Be Used For An Extended Long Period Of Time
Operate the unit for 2
hours with the following
setting.
Operating mode : cool
Temperature : 30°C/86°F
Front panel shaft
CAUTION
Remove the power plug.
If you are using an
independent electric
circuit for your unit, cut
off the circuit.
Remove the batteries in
the remote control.
1-27
Indentations on
the main unit

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis