Herunterladen Inhalt Inhalt Diese Seite drucken

ABB ACH580-01 Kurzanleitung Für Die Installation Seite 324

Frames r0 to r5
Vorschau ausblenden Andere Handbücher für ACH580-01:
Inhaltsverzeichnis

Werbung

324 EN – Quick start-up guide
Change the units shown on the panel if needed.
• Go to the edit view of a selected row by
pressing
• Scroll the view with
Go to the next view by pressing
R0-
R4
R0-
R9
To select a value in an edit view:
• Use
and
Press
press
view without making changes.
EN
DA
Set the date and time as well as date and time
DE
display formats.
• Go to the edit view of a selected row by
ES
pressing
• Scroll the view with
FI
Go to the next view by pressing
FR
IT
To give the drive a name that will be shown at the
top, press
NL
If you do not want to change the default name
(ACH580), continue by pressing
PL
For information on editing text, see ACH580
firmware manual (3AXD50000027537 [English]).
PT
RU
The first start is now complete and the drive is
ready for use.
SV
Press
TR
ZH
.
and
.
to select the value.
(Save) to accept the new setting, or
(Cancel) to go back to the previous
.
and
.
.
(Done) to enter the Home view.
(Next).
(Next).
(Next).

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis