Herunterladen Inhalt Inhalt Diese Seite drucken

Cable Management - humanscale M/FLEX Montageanleitung

Vorschau ausblenden Andere Handbücher für M/FLEX:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14

Cable Management

1
Route power and monitor cables through the
flexible Cable Clips (A) on the Upper Link.
2
Slide the Cover (B) off of the Straight Link.
3
Route cables into the Straight Link and
replace the Cover, sliding until it clicks into place.
4
Route cables through Cable Routing Hook (C).
CAUTION: Don't insert extension cords. Don't insert
any cord connecting one workstation to another.
Adding A Second Row Of Monitors
1
Remove Cap from the top of the first Post.
2
Install the Coupling Screw (A) into the top of
Post. Leave half of the Screw sticking out.
3
Screw second Post onto the Coupling Screw.
Posts must be tightly seated against each other.
4
Push Cap on top of second Post.
CAUTION: Do not install a Post, or a combination
of Posts, that exceed 24" (610 mm) in height.
6
B
A
C
A

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

M/powerM/connect 2

Inhaltsverzeichnis