Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Ordering Replacement Parts - HERKULES BH 920 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
Anleitung BH 920 SPK7
25.10.2005
GB
Important:
You only need to apply minimal pressure for hammer
drilling. Do not apply too much pressure as this will
put unnecessary strain on the motor. Check the
hammer drill at regular intervals.
Re-sharpen or replace bits whenever blunt.

6. Maintenance

Always unplug the machine before starting any
maintenance work!
Keep your machine clean at all times.
Do not use aggressive agents to clean plastic
parts.
To prevent dust from collecting in the air vents,
clean them with compressed air (max. 3 bar)
each time you finish working with the machine.
Check the carbon brushes at regular intervals
(dirty or worn carbon brushes cause excessive
sparking and interference in speed).

7. Ordering replacement parts

Please quote the following data when ordering repla-
cement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
8
All manuals and user guides at all-guides.com
15:28 Uhr
Seite 8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

45.582.12

Inhaltsverzeichnis