Herunterladen Inhalt Inhalt Diese Seite drucken

Pattfield Ergo Tools PE-1000 KFZ Originalbetriebsanleitung Seite 53

Kettenflaschenzug 1000 kg
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
HOOK LATCHES
1
Make sure that the latch 
6
mounting
hook 1
is closed, after it has
been fastened to the mounting point.
Caution! Make sure that the mount-
ing point can withstand the load.
LIFTING LOADS
1
On the front of the chain hoist an arrow
is indicating "UP" (Up - lifting).
LOWERING LOADS
1
On the front of the chain hoist an arrow
is indicating "DN" (Down - lowering).
LOAD CHAIN
1
Visually check the chains for corrosion
and other signs of wear.
3
To indicate the wear of the load chain,
measure the load chains link ø and the
inner length of 5 chain links regularly:
104
EN
of the
2
Make sure that the
latch 6
ing
hook 4
is closed, after the load sling
has been hooked to it.
Caution! Make sure that the load
slings can carry the load.
2
Begin to lift the load by slowly pulling
the hand
chain 3
in the UP direction.
Caution! Make sure that the chain
hoist does not overheat.
2
Begin to lower the load by slowly pulling
the hand
chain 3
in the DN direction.
Caution! Make sure that the chain
hoist does not overheat.
2
Make sure that the end stop 
load chain is securely in place.
Link ø
Link ø
Length 5 Links
New
Limit
New
6 mm
5.5 mm
90 mm
of the load-
1
1
1
5
of the
1
3
Limit
92.5 mm
2
2
2
2
EN
105

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis