Herunterladen Diese Seite drucken

Novoferm NovoSeal S620 Montageanleitung Seite 2

Werbung

Contents
1. Introduction
2. Symbols
3. Operating
.........
3.1 Safety
.........
3.2 Start position
.........
3.3 Stop position
3.4 Unsave entrance vehicle
3.5 Save entrance vehicle
4. Installation instructions
.........
4.1 Preparing
.........
4.2 Measuring installation instruction
.........
4.3 Installing the dock shelter frames
.........
4.4 Installing the curtains
.........
4.5 Positioning the dock shelter
.........
4.6 Installing the dock shelter
.........
4.7 Installing the air cushion
4.8 Installing the steel weight
5. Exploded view
5.1 Part list
6. Safety measures
7. Wiring diagram
1. Introduction
The operated dock shelter NovoSeal S620 is be designed and constructed with regard of the
opening and closing in buildings during the loading and unloading process. The NovoSeal S620
dock shelters are operated manually, due activating a push button on the operating panel. The
frame of the dock shelter leveller is produced from sendzimir galvanized profile. The side and top
plates are coated with plastisol.
Technische Änderungen vorbehalten.
We reserve the right to alter technical specification.
Version: 0.1
Date: 10.08.2015
Page: 2 / 17
Page
2
2
3
3
3
3
4
5
6
6
7
8
9
10
11
12
13
14
15
16
17

Werbung

loading