Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Steps - Welltime Summer Aufbauanleitung

Rundduschwanne
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation steps

Step 1
- Alignment of height-adjustable feet with spirit level.
- In the siphon area concrete is to be chipped off if necessary.
Step 2
- P ress the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the waste water hose to the siphon body [7] and hook it up with the in-house water
disposal.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. The silicone is to be chosen respectively to the construction
materials used - please respect cure times.
Allow 24 hours for silicone
to dry before first use.
Max. 150 kg
- 15 -
24
hours

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Welltime Summer

Inhaltsverzeichnis