Herunterladen Inhalt Inhalt Diese Seite drucken

INTEGRA Merering CALEC energy master Montage- Und Bedienungsanleitung Seite 19

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

A terminal assignment scheme is shown on the inside of the housing cover which corresponds to the
state at the time of delivery. With the fitting of an additional module, this scheme is no longer valid.
®
CALEC
energy master installation and operating instructions
Remove left-hand termi-
nating module as shown.
1. Disengage the latch-
es with a screwdriver
to release the module
from the support rail.
2. Pull the module for-
ward and out.
The removed module is
the supply module for
mains supply or the 24
VDC connect module.
Slide the new module
parallel into the guiding
grooves on the left side of
the device as shown, and
engage on the support
rail.
1. Refit the power supply
(terminating) module
as shown.
2. Connect cables to the
added module.
3. Reconnect the termi-
nating module to the
mains supply.
4. Set the parameters
required for operating
the added module
(see description of the
module type).
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis