Herunterladen Diese Seite drucken

SW-Stahl 20310L Bedienungsanleitung Seite 12

Vorschau ausblenden Andere Handbücher für 20310L:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

NOTE
During the assembly procedure, nuts and bolts should be hand-tightened only. Once assembly is
complete, nuts and bolts may be fully tightened.
1.
Attached the castor wheels (No.27) to the base using nuts and bolts supplied.
2.
Referring to the spare parts drawing, insert the left hand leg (No.2) into the base (No.1) and lock
the leg in place using two locking pins (No.4). Secure in this place using two splint type pin.
Now repeat the procedure for the right hand leg.
3.
Attach the main support post (No.8) to the base assembly (No.1) using 5 bolts (No.9) and five
washers (No.13) and nut (No.14).
4.
Now secure the boom (No.11) to the main support post (No.8) using bolt (No.12) washer (No.13) and
nut (No.14).
5.
Next to ram unit (No.15) should be attached to the main support post (No.8) using bolts (No.16)
nuts and washer (No.17). Then secure the ram unit to the bolt (No.18) nut and washer (No.17).
6.
Insert the boom extension (No.22) into the main boom (No.11), secure in one of the four positions
using bolt (No.9), nuts and washer (No.9 and 10)
7.
Attach the hook and chain assembly (No.24) to the boom using nut, bolt and washer
(No.23 and No.10)
8.
Secure handle (No.19) to the main support post (No.8) using four bolts (No.21) and four washer
(No.20)
9.
Now tighten all nuts and bolts.
12
20310L_manual_75050_de_en_roh.indd 12
20310L_manual_75050_de_en_roh.indd 12
07.01.21 11:55
07.01.21 11:55

Werbung

loading