Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning And Maintenance - Centrometal CentroPelet ZS Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45
Distribution of air between front and ducting
It is possible to adjust manually between the air distribution of the front panel and the distribution of the ducted air.
To adjust the outlet air it will be necessary to slide the heater front panel along its rail. It is possible to move the lever on
the inside of the heater from right to left.
The more the lever is moved to the right, the more the air is directed on the front of the heater.
The hand adjustment will act on the air distribution gate.

6.0 Cleaning and maintenance

Before effecting any maintenance operation or cleaning on the stove, take the following precautions:
• Be sure that all parts of the stove are cold.
• Be sure that the ashes are completely cold.
• Be sure that the general switch is in the "OFF" position.
• Be sure that the plug is pulled out of the socket to avoid accidental contact.
• Once the maintenance phase is completed check that everything is in order as per before the intervention (the brazier is
placed correctly).
!
36 36
Downloaded from
www.Manualslib.com
Follow carefully the following cleaning instructions. Failure
to follow these instructions could create problems with the
operation of the stove.
manuals search engine

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis