Seite 1
ZETAMIX ZXS ISTRUZIONI PER L’INSTALLAZIONE DELLA RUBINETTERIA INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS INSTRUCTIONS POUR L’INSTALLATION DE LA ROBINETTERIE MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY...
Seite 4
Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.
Diese Anleitung auch für:
Zetamix zxs681Zetamix zxs303Zetamix zxs129Zetamix zxs633Zetamix zxs134Zetamix zxs139...
Alle anzeigen