The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: The holes for the installation are on the product.
Step 2: Hold the product onto the location where it is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Hold the product in the desired position and tighten it.
CLEANING AND MAINTENANCE
Raise the canvas after every use.
Avoid folding the canvas.
The screen fabric has to be prevented from intense soiling and can be cleaned with a mild soap sud and a
soft cloth if required.
All mechanical parts of the screen are permanently lubricated and maintenance-free.
Please check in regular intervals:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
Should you have further questions, please contact your dealer.
TECHNICAL SPECIFICATIONS
Type:
Projection format:
4:3
Projection type:
2.5 m (100")
Diagonal:
Screen area:
200 x 150 cm
Surrounding border:
Gain:
Viewing angle:
Base material:
Screen surface:
Thickness:
Dimensions in mm:
2160 x 100 x 80
Weight:
6.4 kg
Please note: Every information is subject to change without prior notice. 07.04.2014 ©
80901125
80901127
Stationary roller screen D
4:3
3 m (120")
240 x 180 cm
2565 x 120 x 85
10.5 kg
80901130
16:9
Front projection
2.25 m (90")
200 x 112.5 cm
4 cm
1.0
100°
PVC
Matt, white
0.4 mm
2160 x 100 x 100
6.5 kg
10/10
80901132
16:9
3.5 m (135")
300 x 168 cm
3200 x 120 x 85
12 kg
00037003.DOC, Version 2.1