Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking; Assembly Tool Request; Exploded Drawing - Vigor VSS Bedienungsanleitung

Schrankwand system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1. When unpacking VIGOR Storage-System (VSS) products, please be sure that the top side is
facing upwards. Do not unpack using sharp tools. After unpacking the VSS products, inspect
carefully for any damage that may have occurred during transit. Check for loose, missing or
damaged parts. Shipping damage claims must be filed with the carrier.

Assembly tool request

To assemble the work bench
you will need:
Phillips screwdriver PH2 (e.g. V1704)
and a 10 mm open-end wrench (e.g. V1044).

Exploded drawing

Illustrative for all VSS products.
ViGOR GmbH
ViGOR GmbH
[ +49 (0) 21 91 / 97 95 • \ +49 (0) 21 91 / 97 96 00 • ] info@vigor-equipment.com • ^ vigor-equipment.com
[ +49 (0) 21 91 / 97 95 • \ +49 (0) 21 91 / 97 96 00 • ] info@vigor-equipment.com • ^ vigor-equipment.com

Unpacking

• ; Am Langen Siepen 13-15 • 42857 Remscheid • GERMANY
• ; Am Langen Siepen 13-15 • 42857 Remscheid • GERMANY
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis