Herunterladen Inhalt Inhalt Diese Seite drucken

Step 7: Preparing The Power Cable; Step 8: Connecting The Faston Connectors; Step 9: Installing The Left Cover - STANLine Box 4G Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 58
EN
Preparing the power cable
Remove the power cable insulation
(inside the cover, 1 cm +/- 2 mm) to
connect the Faston connectors.
Connecting the Faston connectors
Connect the Faston connectors to
the 2 pins in the left hole (no mounting
direction).
Installing the left cover
Screw the cover (4 M3 screws and
washers) by adjusting the length of the
cable (inside the hole). Screw the cable
gland onto the cable.
8
STEPS
7
8
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis