Herunterladen Diese Seite drucken

Vital-Office Powerlift RE2 Montageanleitung Seite 4

Werbung

Büromöbel
Büromöbel
Keypad left or right
Vertical cable guide
Cable canal
Extra Plug Box can be
screwed under table top.
This leaves the cable
canal free for cables.
Adapter for Soft
Protection (Modesty
panel) Please always
slide one side first and
then the other side!
(Because of the curve)
Powerlift
RE2
© www.vital-office.net | 20 November 2019 |
4

Werbung

loading