Nemo 96 HDe
1.2
Connection
select the connection
↵
to confirm
Select the type of connection required, scrupulously respecting the connected wiring
diagram.
The connections that can be selected are:
Symbol
Line
Load
1N1E
Single-phase
-
3N3E
3 phase 4 wire Unbalanced
1.3
Average power and current integration time
Selectable integration time:
5, 8, 10, 15, 20, 30, 60 minutes
The selected time is valid for both the current and the average power
select the time value
↵
to confirm
8
n° external CT Diagram
Connection
1
S 1000/467
3
S 1000/468
1.4
Hour-meter counting start
Select the magnitude which starts the hour-meter counting:
1.4a
Voltage counting start
Voltage:
counting start with > 10V phase voltage
select voltage or power
↵
to confirm
1.4b
Power counting start
Power:
counting start with 3-phase programmable active power
select voltage or power
↵
to confirm
0...50%Pn
move the cursor
increase/decrease the set value
↵
to confirm
Voltage or Power
07/17 10783611 WEB E cod.MF96E06