Herunterladen Diese Seite drucken

REMEHA BH83 Handbuch Seite 4

Werbung

English
1
Electrical compliance / Marking
This product complies to the requirements to the european directives
and following standards:
2006/95/EC Low Voltage Directive
Reference Standard: EN 60.335.1.
2004/108/EC Electromagnetic Compatibility Directive
Reference Standards: EN 50.081.1 / EN 50.082.1 / EN 55.014.
2
Mounting
Fit the connection kit as shown in the drawing.
- In order to facilitate the bleeding, it is recommended to fill the
installation via drain cook onto the safety unit.
- To install the stoppers
not used.
- Do not put hoses into shapes in which air pockets can be formed.
- When making the electrical connection of the load pump:
Control panel instructions.
- Check the leak tightness of the connections.
The installation must include a safety valve connected
directly to the boiler outlet.
4
(provided with the kit) on the openings
Nederlands
1
Elektrische conformiteit/ / Markering
Dit product voldoet aan de eisen van de volgende europese
richtlijnen en normen:
2006/95/EG Richtlijn Laagspanning
Overeenkomstige norm: EN 60.335.1.
2004/108/EG Richtlijn Elektromagnetische Compatibiliteit
Beteffende normen: EN 50.081.1 / EN 50.082.1 / EN 55.014.
2
Montage
Monteer de verbindingskit zoals aangegeven op de tekening.
- Laat de installatie door de aftapkraan (op de veiligheidsgroep) vol
lopen om de ontluchting te bevorderen.
- Stop de niet gebruikte openingen dicht met behulp van de
meegeleverde stoppen
- Geef de slangen geen vorm die luchtbellen kan opsluiten.
- Voor de elektrische aansluiting van de laadpomp:
Handleiding van het bedieningspaneel.
- Controleer de dichtheid van de aansluitingen.
De installatie moet voorzien zijn van een veiligheidsklep
die
rechtstreeks
verwarmingsketel is aangesloten.
BH83 - BH93
.
op
de
vertrekleiding
05/06/2015 - 94861700-02
van
de

Werbung

loading

Diese Anleitung auch für:

Bh93