Herunterladen Inhalt Inhalt Diese Seite drucken

General Instructions - T&S B-0315 Installations- Und Wartungsanleitungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

General Instructions

Nozzle Installation:
Note: Nozzles should be installed
first.
1. Shut off water supply and drain
lines. Apply Teflon tape or pipe joint
compound to threaded end of no.12.
2. Tighten no.12 firmly by hand into
no.1.
12
apply Teflon
tape to
threads
before
installing
no.1
Faucet Installation:
1. Drill (2) two holes, approximately
1-1/4" [3 cm] diameter in wall with 3"
[7 cm] vertical centers, where you are
installing no.1.
2. Apply Teflon tape or pipe joint
compound to water supply lines.
3. Connect no.7 to water supply lines
by attaching no.8 with eccentric
centers onto nipple supplied by
others and tighten no.8 against wall.
Make sure no.11 is in place. Nut
behind wall to be supplied by others.
Trim supply lines if necessary.
3
[7 cm]
4. Turn on water supply and check
for leaks.
4
11
8
wall
water supply line
(supplied by others)
nut
1
8
water supply line
(supplied by others)

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

B-0315-ln

Inhaltsverzeichnis