Herunterladen Diese Seite drucken

Orac Decor H101 Installationsanleitung

Dekorativer kamin

Werbung

0 28 64 / 94 87-90
0 800-39 37 464
01 ADHESIVES
INTERIOR
POROUS AND
DRY SURFACE
glueing on
wall and
ceiling
02 INSTALLATION
min.
min.
10cm
10cm
max. 2 - 3kW
01
front
front
0 28 64 / 94 87-90
0 800-39 37 464
shop@ewering.de
Full warranty coverage if provided instructions have been followed to the letter.
+
joints
02
shop@ewering.de
www.stuckleistenprofi.de by
I N S P I R I N G
EXTERIOR
NON-POROUS
HUMID SURFACE
glueing on
wall and
ceiling
121,0
cm
98,9
cm
120,0
cm
4
cm
www.stuckleistenprofi.de by
01/2011
EWERING
P R O F I L E S
INSTALLATION OF H101
+
joints
89,1
cm
4
cm
EWERING
page 1/2

Werbung

loading

Inhaltszusammenfassung für Orac Decor H101

  • Seite 1 0 800-39 37 464 shop@ewering.de www.stuckleistenprofi.de by I N S P I R I N G P R O F I L E S INSTALLATION OF H101 Full warranty coverage if provided instructions have been followed to the letter. 01 ADHESIVES INTERIOR EXTERIOR...
  • Seite 2 EWERING 0 28 64 / 94 87-90 0 800-39 37 464 shop@ewering.de www.stuckleistenprofi.de by ering Raumdesign Schulstraße 3 48734 Reken Fon: 0 28 64 / 94 87-90 Fax: 0 28 64 / 94 87-99 shop@ewering-online.de side water 24 hrs 1° x 2°...