Herunterladen Diese Seite drucken

Operation - Dahle 550 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für 550:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Follow safety instructions prior to operation of the safety shearing machines.
2 .
OPERATION
CAUTION:
Exceeding the specified cutting height or cutting unsuitable material leads to
damage of the round knife.
To use the entire cutting width, push knife head (6) against of the two side sections (4).
Place material to be cut against guide bar (1) and rear stop (2).
Press down material to be cut by applying pressure to pressing bar (7).
Pull knife head (6) quickly along the guide rod (5).
The cutting operation can be carried out in both directions.
Use unwinding rod (12, roll-holder accessory) to cut material on rolls.
Swing out rockers (1 1) and mount safety shearing machine securely on a wall (one can also work from
a roll without wall mounting by putting retainers on the rockers).
l n s e d u n w i n d i n g r o d ( 1 2 ) w i t h r o l l ( 1 3 ) i n r o c k e r s ( 1 1 ) .
3 .
M A C H I N E C A R E
Clean guide rod (5) occasionally with a moist, lintfree cloth.
4 .
C H A N G I N G K N I F E H E A D
Push the knife head (6) against the one side section (4).
Turn the unit over.
Remove the two screws (15) from the other side section using a crosstip screwdriver.
Remove the side section.
Slide the knife head (6) off the guide rod (5).
Do not reach under the knife head! Round knife is very sharp!
Slide the replacement knife head (4) along the guide rod (5) up to the side section still mounted.
Ensure that the round knife is positioned in front of the lower knife (B), and not behind it.
Do not reach under the knife head! Round knife is very sharp!
Replace the side section (4) and secure with the two screws (15).
- 8 -

Werbung

loading

Diese Anleitung auch für:

552554556558750