Assembly instruction
24_BNC-50-2-20, 24_BNC-50-2-39, 25_BNC-50-2-20
Connector type:
25_TNC-50-2-20, 25_TNC-50-2-21
EZ_86 ; Sucoform_86 ; Multiflex_86
Suitable cables:
Parts list connector:
A
Assembly steps:
Picture
EZ cable
SUCOFORM
MULTIFLEX
A
C
Shrink tube
C
The cable assembly of R.F. connectors can only be done by well trained assembly staff and suitable assembly equipment.
Huber+Suhner's skilled staff and specialised equipment are available to carry out complete R.F. lead-assembly on your behalf.
We mount your connectors on cables at economic prices! Please contact our representative for further details of this service.
Series BNC/TNC
B
Process
For EZ and SM cable :
Prepare cable according to
diagram.
Dimension 16 mm applies
to SUCOFORM with
jacket.
For Multiflex cable :
Dive the on length cuttet
cable in flux and tin.
Remove cable dielectric
and tinned braid according
to diagram.
Slide insulator A to about
cable dielectric.
B
Heat inner contact B using
a soldering iron and flow
small amount of solder into
bore.
Push inner contact B onto
cable conductor and
solder.
Mount assembly tool W 88
onto connectors (important
for interface dimensions).
Push prepared cable into
connector body C to the stop
and solder copper jacket to
connector body C at Z.
Remove assembly tool
W 88.
Slide shrink tube over
connector body C and
shrink with Hot-air fan.
Dimension X max. 1mm.
0000179119
Old instruction No. 09100
Inner conductor contact:
Outer conductor contact:
For MULTIFLEX cable it is recommended
to use a Shrink tube. The Shrink tube is
not included in the connector.
C
Feature / Check
Tools required
Cut cable end
Stripping tool W 157.
perpendicular to cable
See instruction sheet
axis.
DOC-0000199604 for
Do not damage inner
detailed description.
conductor, dielectric and
braid.
Blades 74 Z-0-0-68
The solder must flow at
behind for min. 10 mm.
Blades 74 Z-0-0-68
If the cable does not fit
Flat-nose pliers
into the cable entry, use a
flat-nose pliers to
calibrate the braid.
Immediately remove
Soldering iron
soldering iron to avoid
Solder
melting of dielectric.
Assembly tool : W 88
After that solder
Alcohol
immediately cool down and
Solder iron
clean with alcohol.
Solder
Avoid excessive heat.
Hot-air fan
Deutscher Text: siehe Rückseite
Soldered
Soldered
Revision
E
Date
01.03.12
Initiator
4779/JPE

Werbung

loading

Inhaltszusammenfassung für HUBER+SUHNER TNC-Serie

  • Seite 1 Dimension X max. 1mm. Revision The cable assembly of R.F. connectors can only be done by well trained assembly staff and suitable assembly equipment. Huber+Suhner’s skilled staff and specialised equipment are available to carry out complete R.F. lead-assembly on your behalf. Date 01.03.12 We mount your connectors on cables at economic prices! Please contact our representative for further details of this service.
  • Seite 2 Spalt X max. 1mm. Die Montage von HF-Verbindern kann nur durch geschultes Personal, das über die richtige Ausrüstung verfügt, erfolgen. Version Huber+Suhner verfügt über ausgebildete Fachkräfte und rationelle Einrichtungen zur Herstellung kompletter HF-Verbindungs- Datum 01.03.12 leitungen. Wir montieren Ihre Verbinder zu wirtschaftlichen Preisen! Wenden Sie sich an unsere Vertreter.

Diese Anleitung auch für:

Bnc-serie24_bnc-50-2-3924_bnc-50-2-2025_bnc-50-2-2025_tnc-50-2-2125_tnc-50-2-20