Herunterladen Diese Seite drucken

Nash titan Montageanleitung Seite 2

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

TITAN SET UP INSTRUCTIONS
1.
Remove the Titan from the bag and lay
the groundsheet out as a pegging guide.
(NOTE – Heavy duty groundsheets are
supplied as standard with Titan TC and Titan
TC Pro and as an optional accessory for Titan
T1 and T2)
2. Unpack the shelter, unfolding and
straightening the Titan's legs.
3. Push fit the pre-formed, angled legs together
one by one.
4. Holding the centre boss in front of you, grip
the second leg in from the outside of the
frame.
5. Pull the second legs out and around towards
you. If there is any resistance to this
movement, stop and check the legs are not
crossed over or caught on the material.
6. Now grip the shorter outside poles and pull
them around in front of you until they reach
1
4
6
7. Pull the front rib mouldings on the leading
8. Locate the storm pole threads through the
9. Peg through both cover eyelets and
10. Locate both front storm poles.
11. Peg the sides and front of the Titan and
12. Extend the storm poles to lengthen them
2
5
7
a stop and form the finished Titan frame
shape.
edge of the cover towards you and locate the
front poles into them to tension the cover.
metal eyelets in the Titan cover.
corresponding groundsheet eyelets (if used)
together. Start behind the rear pole and peg
one additional eyelet each side.
secure the storm poles into the velcro
retaining sleeves.
until the cover is tight between the front rib
mouldings and side pegging points.
3
8

Werbung

loading