Herunterladen Diese Seite drucken

Lechler Dropleg Montageanleitung Seite 2

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Items in the kit
Position
Description
1
Mounting Clamp
2
Dropleg Tube with adapter
3
Connecting hose
Required tools for assembly:
Wrench size 14mm and 10mm (twice)
1. Assembly of mounting clamp to spray boom
Fix plates to the boom
stainless steel to avoid
considering rowspacing
corrosion - not included
of the crop. Screw soft
in the delivery).
to avoid deformation of
the plates.
Greasing the screws
If length of the screws is
eases assembly and
not sufficient use a
disassembly.
thread bar (best in
2. Assembly of Dropleg
UL
Connect Dropleg
with
ATTENTION:
UL
mounting clamp, put
For increased stability
washer on the belt and
please mount the was-
secure with cotter pin.
her between cotter pin
and adapter.
Position nozzle body to
the rear of direction of
sprayer (see figure
besides).
Otherwise you may
cause damage to the
Dropleg
and the
UL
boom.
Manual Dropleg
UL
No
1
1
Position 1
1
Position 3
Take care to assemble
in a way that avoids any
collision when boom is
folded.
Direction of travel
< < < < < < < <
Fahrtrichtung
3. Connect the Dropleg
system of the boom
Use connection hose to
fit with nozzle body.
First connect bayonett
cap with gasket to the
nozzle body. Then
unscrew blue nut of
Dropleg
adapter, put it
UL
on the hose, fit hose
onto the connector and
rescrew the nut
(14 mm AF).
ATTENTION: Do not
Position 2
overtorque the hose -
see picture.
6. Use in the field
Droplegs
should be
UL
positioned in a way that
they can move freely
during spraying bet-
ween the rows.
Take care not to hit the
ground with the boom
during operation in
order to avoid damage.
Droplegs
can move
UL
backwards when tou-
ching ground. We re-
commend a
minimum clearence of
80 cm between boom
and ground.
Lechler GmbH
.
P.O. Box 13 23
.
to the liquid
4. Folding the boom
UL
When folding or unfol-
ding the boom Dropleg-
s
UL
Especially when unfol-
ding the boom take care
that the
Droplegs
caught up.
If necessary fit moun-
ting clamps alternating
on boom segments.
Avoid the connection
hose being bent. If re-
quired shorten the hose.
7. Storing the
Droplegs
Nozzle tips
Droplegs should be sto-
(not included):
red even on the ground
or best hanged-up.
TwinSpray Cap with
ID/IDN, IDK/IDKN,
Store Dropleg
FT, LU
free or winterize them.
IDKT
Purge remaining fluid in
DF
Dropleg
For adjustment of
nozzle tips optionally
use templet part num-
ber 092.163.42.10.30
Agricultural Nozzles and Accessories
72544 Metzingen, Germany
Phone +49 7123 962-0
Fax+49 7123 962-480
.
.
5. Road
transportation
During transit take care
that Droplegs
do not
UL
should fold freely.
touch the ground. In
case boom is too low tie
Droplegs
up or
UL
disassemble. If possible
do not get
lock boom in a higher
UL
transport position.
Take care of the regio-
nal regulations accor-
ding transportation.
UL
frost-
UL
pipe.
UL
info@lechler.de
www.lechler-agri.com
.
.

Werbung

loading