Herunterladen Diese Seite drucken

level one FEP-0811 Schnellinstallationsanleitung Seite 3

8-port fast ethernet poe switch
Vorschau ausblenden Andere Handbücher für FEP-0811:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
ENGLISH
Installation
Power
Link/Act
LED Indicator
LED
Status
Indicator
On
Power
Off
On
Blinking Transmitting / Receiving data
Link/Act
Off
Connecting Equipment
Step1. Inspect the Power Adapter carefully, and make
sure that it is properly connected to a power
source.
Step2. Plug-in the Power Adapter to the Switch.
Step3. Connect your network devices with the switch
by using Ethernet cable. (e.g. Cat-5e)
SFP
Meaning
Power is on.
Power is off.
Port is connected
Port is not connected
3

Werbung

loading