Herunterladen Diese Seite drucken

Installation - level one FEU-1610 Schnellstartanleitung

6 / 24 port fast ethernet switch

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
ENGLISH                                                                                   
 

Installation

   
Power 
Link/Act 
 
LED Indicator 
Status 
LED Indicator
On 
Power is on. 
Power 
Off 
Power is off. 
On 
Port is connected 
Blinking Transmitting / Receiving data 
Link/Act 
Off 
Port is not connected 
 
 
Connecting Equipment 
Step1. Inspect the Power Adapter carefully, and make sure 
that it is properly connected to a power source. 
Step2. Plug‐in the Power Adapter to the Switch.   
Step3. Connect  your  network  devices  with  the  switch  by 
using Ethernet cable. (e.g. Cat‐5e) 
 
 
 
 
 
Meaning 
3
 

Werbung

loading

Diese Anleitung auch für:

Feu-2410