Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation

This extractor hood is intended to be
mounted onto the kitchen wall.
1. Remove the grease filter (refer to
Operating Instructions).
2. Draw a line on the wall from the ceiling
to the lower edge of the hood at the
centre of the location where the hood is
going to be mounted.
3. Using the template, mark positions on
the wall for the screws.
Ensure that the minimum distance bet-
ween the hob and the extractor hood is
maintained – 550 mm for an electric hob
and 650 mm for a gas hob. The bottom
edge of the template equates to the lower
edge of the extractor hood.
4. Drill 4 x l 8 mm holes for the extractor
hood and 2 x l 8 mm holes for the
chimney panelling. Insert plugs into the
holes so that they are flush with the wall.
2 0 0
418
36,5
mind.550 Elektro
mind.650 Gas
Note: Take into account any special
accessories that are going to be fitted.
5. Attach the 2 enclosed spacers to the
fixing bracket for the flue duct panelling.
Attach the fixing bracket for the
chimney panelling using two hexagon
head cap screws.
6. Screw in the two upper hexagon head
cap screws leaving them extended by
approx. 5 mm.
7. Attach the extractor hood to the
screws.
ca.5mm
23

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis