Herunterladen Inhalt Inhalt Diese Seite drucken

Add An Upright Post For The Gate; Add Top Rails - Petsafe Do-It-Yourself Dog Run Anleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
Step

Add an Upright Post for the Gate

3
1. Gather 1 upright, 2 clamps , and 1 -
2. Install the gate post 50 cm to either side of the corner upright.
Important: Do NOT have the gate span a joint in the frame. The frame can come apart at the
swedged joint.
Note: Gate Opening is 50 cm between posts. All swedged joints will be loose until fence fabric is installed.
____________________________________________________________________________________

Add Top Rails

Step
4
1. Gather 4 corner rails, 4 frame rails, 10 clamps and 5 -
2. Point all top rail swedges clockwise the same direction as the bottom frame.
3. Connect rails to all posts (4A). Tighten all clamps as you go.
Important: Check that all posts are straight up and down. Confi rm that all nuts are tight.
5
/
" x 2" carriage bolt with nut.
16
5
/
" x 2" carriage bolts with nuts.
16
www.petsafe.net
50 cm
4A
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis