Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Prerequisites - Edilkamin R Installation, Gebrauch Und Wartung

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 58
INSTALLATION

INSTALLATION PREREQUISITES

The HYDRAULIC KIT is supplied with a paper template (X) which aids in positioning the hydraulic piping for connection to the
boiler.
Taking into consideration the maximum overall dimensions of the boiler (Z), it is possible to derive the correct position of the
hydraulic attachments.
As shown in the picture below, the template should be placed at floor level and aligned with the left side of the maximum overall
boiler dimensions (Y).
NB: the outlines of the larger holes must be positioned to the left (when looking at the wall from the front).
Remember to adhere to the installation distances specified in the product data sheet.
W
Y
Z
X
- 22
-
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

RwR2Rw2

Inhaltsverzeichnis