Herunterladen Diese Seite drucken

RODE HUB Schnellstartanleitung Seite 3

USB-C.
3. Podłącz wszystkie inne urządzenia USB, karty SD
lub karty microSD, których zamierzasz używać.
DUTCH
1. Sluit uw RØDE Hub aan op stroom met de
meegeleverde voedingsadapter en stroomkabel.
2. Sluit uw laptop of ander apparaat aan op de
RØDE Hub met de meegeleverde SuperSpeed
USB-C-kabel.
3. Sluit alle andere USB-apparaten, SD-kaarten of
microSD-kaarten aan die u wilt gebruiken.
SWEDISH
1. Anslut din RØDE Hub till ström med den
medföljande nätadaptern och strömkabeln.
2. Anslut din bärbara dator eller annan enhet till
RØDE Hub med den medföljande SuperSpeed
USB-C-kabeln.
3. Anslut eventuella andra USB-enheter, SD-kort
eller microSD-kort som du tänker använda.
INDONESIAN
1. Hubungkan RØDE Hub Anda ke daya
menggunakan adaptor daya dan kabel daya
yang disertakan.
2. Hubungkan laptop atau perangkat lainnya ke
RØDE Hub menggunakan kabel SuperSpeed
USB-C yang disertakan.
3. Hubungkan perangkat USB lainnya, kartu SD,
atau kartu microSD yang akan Anda gunakan.
North America
This device complies with Part 15 of the FCC
Rules. Operation is subject to the following two
conditions: (1) this device may not cause harmful
interference, and (2) this device must accept any
interference received, including interference that
may cause undesired operation.
Please note that changes or modifications of this
product is not expressly approved by the party
responsible for compliance could void the user's
authority to operate the equipment.
NOTE: This equipment has been tested and
found to comply with the limits for a Class
B digital device, pursuant to Part 15 of the
FCC Rules. These limits are designed to
provide reasonable protection against harmful
interference in a residential installation. This
equipment generates, uses and can radiate radio
frequency energy and, if not installed and used
in accordance with the instructions, may cause
harmful interference to radio communications.
However, there is no guarantee that interference
will not occur in a particular installation.
loading