Herunterladen Diese Seite drucken
Sunstay Pro gen2
VGP726 Off Grid
The luminaire should be positioned so that prolonged staring into
the luminaire at a distance closer than 0,384 m is not expected
Connect the battery for luminaire operation
This luminaire must be installed by qualified personnel only
Disconnect battery and panel before servicing
Use gloves to install/service the luminaire
Always follow this mounting instructions to fix the luminaire
Never modify the luminaire nor the fixation locations for installation
Risk of accident due to incorrect tightening torque
583 - 443000022506
QR
2025-05-20
15 x 15
© Signify Holding
All rights reserved
07
09
IK
66
IK
IP
PV panel
1/10
outdoor
Data subject to change without notice
Keep for future reference:
4-10
www.philips.com/lighting
loading

Inhaltszusammenfassung für Philips Sunstay Pro gen2

  • Seite 1 Sunstay Pro gen2 VGP726 Off Grid outdoor 4-10 PV panel The luminaire should be positioned so that prolonged staring into the luminaire at a distance closer than 0,384 m is not expected Connect the battery for luminaire operation This luminaire must be installed by qualified personnel only...
  • Seite 2 Dimensions Cx Coeficients Energy efficiency class 2/10...
  • Seite 3 For optimal performance of the luminaire contact your local SIGNIFY employee for solar sizing and configuration. The installation of the luminaire is not recommended under these conditions: The luminaire performance and battery charging can be affected by external parameters. Additional photovoltaic vertical panels can be fixed to the pole. Contact your local SIGNIFY employee for further information.
  • Seite 4 Spigot fixation Luminaire orientation Post Top (PT): Side Entry (SE): Ø76mm or Ø60mm Only Ø60mm Open luminaire only if base is supported or Spigot into pole if luminaire is installed on the pole 4/10...
  • Seite 5 Sensors and type of luminaire Sensors and type of luminaire Sensors and type of luminaire 5/10...
  • Seite 6 The luminaire type A or B can be upgraded to C or D Luminaire A or B: Charge Controller CC G5 is connected to BLE Bluetooth module Luminaire C or D: Charge Controller CC G5 is connected to DFLEX Contact your local SIGNIFY employee for further information Recomended luminaire cleaning 6/10...
  • Seite 7 Labelling Watch out to the installation date. The battery is 70% level charged when leaving factory. Depending on storage time and ambient temperature, the battery can lose some charge. The labels in the luminaire containe a QR code. For any contact with SIGNIFY regarding the product, please scan the QR code an keep it for reference.
  • Seite 8 Storage, installation, use, operation and maintenance of the products needs to be performed exactly according the instructions in this manual and/or other instructions as may be provided by us to guarantee safe use of the product over its entire lifetime. Failure to adhere to these instructions will invalidate your entitlement to warranty.
  • Seite 9 Storage, installation, use, operation and maintenance of the products needs to be performed exactly according the instructions in this manual and/or other instructions as may be provided by us to guarantee safe use of the product over its entire lifetime. Failure to adhere to these instructions will invalidate your entitlement to warranty.
  • Seite 10 The information presented in this document is not intended as any commercial offer and does not form part of any quotation or contract. Philips and the Philips Shield Emblem are registered trademarks of Koninklijke Philips N.V..

Diese Anleitung auch für:

Vgp726 off grid