1-Phasen Meter
80A/32A
Art. 152050 / 152051
Riedstrasse 18 | 6343 Rotkreuz | Switzerland
support@smart-me.com | +41 (0) 41 511 09 70
www.smart-me.com
smart-me wiki:
dok.smart-me.com
This document was last edited on: 2023-07-28
Installation & Configuration Guide
EN- Scan the QR Code to find the Installation and Configuration guide as well
as additional information
DE- Scanne den QR-Code, um die Installations- und Konfigurationsanleitung
sowie weitere Informationen zu erhalten.
https://web.smart-me.com/152050-qr
Declaration of Conformity
smart-me AG, Riedstrasse 18, CH-6343 Rotkreuz hereby declares that the
smart-me 1-Phasen Meter 80A complies with the following guidelines:
The CE-symbol confirms that this product conforms
with the above mentioned norms and regulations
Safety instructions
The safety instructions must be observed under all circumstances:
The device is intended for use in buildings.
The device is intended for operation in a dry, dust-free location without
direct sun exposure.
The device is intended exclusively for measuring electrical energy and must
not be operated outside of the specified technical data.
Frequent switching on and off can shorten the lifespan of electronic
devices. Only set up automatic switching with frequent switching on and
off if the connected devices are designed for this. We are not liable for any
damage to connected devices.
When installing or changing the device, the conductors that are connected
to the device must be free of voltage. With CT meters, the secondary side
of the transformer must be short-circuited or the primary side opened,
otherwise high and life-threatening voltages can arise. This may destroy
the transformer and cause life-threatening injuries to people.
Touching live parts is life-threatening! For this reason, the corresponding
pre-fuses must be removed and stored in such a way that other people
cannot reinsert them unnoticed.
The device may only be installed by competent and appropriately trained
personnel.
The local safety and factory regulations must be observed.
For currents greater than 65A, the following cable requirements must be
met: T installation cable, blank Cu cable, cross-section: 35mm2
The screws of the cable connections (L, N) should be fastened with a
torque of max. 1.5 Nm.
The screws of the inputs and outputs (E1, S0) should only be fastened by
hand.
Smart-me hardware must not be modified or improperly repaired. No liability
is accepted for any resulting damage.
The energy meter must be installed in a cabinet with protection class IP51
or better
Isolation of the mains connection terminals: Reinforced
Isolation of S1, S0-0 and E1 terminal connections: If a terminal with
voltages above SELV is used, reinforced insulation is required for all
terminals.
loading

Inhaltszusammenfassung für smart-me 152050

  • Seite 1 The screws of the inputs and outputs (E1, S0) should only be fastened by ● hand. Smart-me hardware must not be modified or improperly repaired. No liability ● is accepted for any resulting damage. The energy meter must be installed in a cabinet with protection class IP51 ●...
  • Seite 2 Le viti dei collegamenti dei cavi devono essere serrate con una coppia di ● ● von max. 1.5 Nm angezogen werden. Le matériel Smart-me ne doit pas être modifié ou réparé de manière 1,5 Nm. ● Die Schrauben der Ein- und Ausgänge (E1, S0) sollten nur von Hand inappropriée.