Herunterladen Diese Seite drucken

Erba 33252 Bedienungsanleitung Seite 11

Seilzug 2t
Vorschau ausblenden Andere Handbücher für 33252:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
All manuals and user guides at all-guides.com
GB - INSTRUCTION MANUAL
8. OPERATION INSTRUCTIONS
Pulling
Lock the spring (6) as shown in (A). Now you can put tension on the cable by using the handle (4)
and start pulling the load.
Release
To release the cable the spring (6) must be unlocked as shown in (B). CAUTION: never unlock the
spring when the winch is still under tension/load!
Unwinding the cable
Once the cable is released pull the handle (4) all the way towards the load hook (2) and holt it in
this position. Now you can easily unroll the cable.
9. SERVICE AND REPLACEMENT PARTS
Use original replacement parts only!
10. WARRANTY
Legal warranty regulations apply.
11. DISPOSAL
Our products are packed in order to prevent damage during transport. Packing materials are va-
luable resurces and therefore can and should be recycled. The product itself consists of various
materials (metals, oils, plastic, etc.) and should be disposed with care and in accordance with your
federal and local disposal regulations.
12. LEGAL INFORMATION
All rights reserved. This manual is copyrighted. Reproduction in and form (digital, print, etc.) is
strictly prohibited without the written permission of ERBA GmbH.
ERBA GmbH
A-1230 Wien
Talpagasse 6
Servicehotline: Tel: +43(0) 1 930 10 - 160 · Fax: +43(0) 1 930 10 - 960 · E-Mail: service@erba.at
Page 11
Changes, print, punctuation and other errors reserved!
Instruction manual
03019
Issue: 05/2018

Werbung

loading