Herunterladen Diese Seite drucken

LEGRAND 310963 MTBS 45A Installationsanleitung Seite 19

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
3 Installation
• Fasten the cable entry boxes to the MTBS
BOX unit and then fasten the cables with the
locking nuts of the cable glands. See Fig. 4.
Picture 4
• After connecting power cables to the MTBS
BOX, make connections to the UPS units as
below. See Fig. 6.
a. Connect the parallel cable from the MTBS
BOX to UPS.
b. Connect the power cables from the MTBS
BOX to UPS.
310963 MTBS 45A
• Fasten the entry boxes' cover to the unit with
screws. See Fig. 5.
Picture 5
Picture 6
19

Werbung

loading