Z'TOWER
o
Jump on the platforms.
o
Use boards as a platform.
o
Move the mobile access and working tower on ground which is sloped more than 3%.
o
Move the mobile access and working tower with a motor vehicle.
o
Move the mobile access and working tower in wind speeds above 35 km/h.
o
Move the mobile access and working tower when personnel or equipment are on it.
o
Lift the mobile access and working tower with a crane or bridge crane.
o
Keep hatches blocked open.

Chapter 5 : Passing the base through a door

1560 mm HT
Chapter 6:
Verification, upkeep, maintenance and dismantling
• After use at each site, ensure that the mobile tower is cleaned with a clean cloth.
Inspect parts before each assembly, particularly:
- Castor tyres and brakes.
- Safety devices.
- Working platform hooks and fasteners.
- The plywood on the working platforms.
- The stabiliser mounting brackets.
All parts with the following defects:
- Permanent deformation.
- Perforations.
- Score marks (as a result of grinding, for example...)
- Severe oxidation
... should be discarded!
If in doubt, change the part.
When the part is being changed, it must be replaced with a genuine part.
Keep parts clean, and safety devices in good working order.
Replace or clean all the panels or stickers with operating and safety instructions.