Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning The Ash Drawer; Smoke Conduit Cleaning; Extraordinary Maintenance; To Clean The Combustion Chamber, Proceed As Follows - Ravelli RBV 808 Bedienungs- Und Wartungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Cleaning the ash drawer

The ash drawer must be cleaned every 30 days, (depending on the amount of time the stove is used and what type of pellet is used).
To clean the ash drawer, proceed as follows:
Cleaning the pellet tank
To clean the pellet tank, proceed as follows:
step
action
1
Periodically remove the wood sawdust accumulated on the bottom of the tank, using a vacuum cleaner.

Smoke conduit cleaning

! IMPORTANT
step
action
1
Open the hatches.
2
Clean the ashes, eventually use a brush or similar and reassemble everything.
Note: the hatches are equipped with gaskets, therefore, before reassembling them, make sure that the gaskets are not
worn.
Note: The operation must be carried out with a cold stove, using an ash-type aspirator.

Extraordinary maintenance

Extraordinary maintenance activities must be carried out by staff from the Authorised Assistance Centre.
Do not wait for components to be deteriorated by use before proceeding with their replacement. Replace a worn
component before it is completely broken to prevent any damage caused by sudden component breakage.
Schedule the above extraordinary maintenance activities with the Authorised Assistance Centre.
Deep combustion chamber cleaning
! IMPORTANT

To clean the combustion chamber, proceed as follows:

Use and maintenance manual RBV 808 - RBV 810
This operation must be carried out by a Ravelli Assistance Centre.
Schedule this type of cleaning with the Ravelli Assistance Centre.
The smoke conduit must be cleaned every 3 months.
PARTS / FREQUENCY
Inspection hatch
Deep combustion chamber cleaning
Door gasket
Chimney
This operation must be carried out by a Ravelli Assistance Centre.
Schedule this type of cleaning with the Ravelli Assistance Centre.
Slide for ashes
60- 90 DAYS
1 SEASON
Rev.1 14/02/18
Page 69
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rbv 810

Inhaltsverzeichnis