Herunterladen Inhalt Inhalt Diese Seite drucken

Pulling A Load; Retracting A Load - Westfalia 82 45 37 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Pulling a Load

Push the toggle lever (5) into the middle position.
1.
Unwind the cable up to the desired length. Make
2.
sure there are at least three windings of steel
cable remain on the drum!
Fasten the hook on the load to be pulled.
3.
Push the toggle lever to the top position (see
4.
picture on the right). Turn the hand crank clock-
wise in order to pull the load.
Make sure the cable will be wound properly on
5.
the drum, winding next to winding. Make sure the
steel cable cannot get entangled.
As soon as the load is pulled up to the desired
6.
position, secure the load against rolling away or
slipping.
Only after securing the load, loosen the cable a
7.
little bit in order to be able to remove the hook.

Retracting a Load

Push the toggle lever (5) into the middle position.
1.
Unwind the cable up to the desired length. Make
2.
sure there are at least three windings on the
drum!
Fasten the hook on the load to be pulled. Use
3.
suitable lashing tackles.
Push the toggle lever to the bottom position (see
4.
picture on the right).
Turn the hand crank counter clockwise in order to
5.
retract the load.
As soon as the load is retracted up to the desired
6.
position, secure the load against rolling away or
slipping.
Only after securing the load, loosen the cable a
7.
little bit in order to be able to remove the hook.
Operation
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis