Herunterladen Diese Seite drucken

Blaupunkt 5II84353 Bedienungsanleitung Seite 63

Kochfeld autark, induktion

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connecting the hob
For the various connection options, use the brass terminal bridges located in the casing.
Single-phase connection 230V~1P+N:
Place a terminal bridge between terminals L1 and L2, then between terminals L2 and L3 and then
between terminals N1 and N2.
Connect the earthing to the « earth » terminal, the neutral to terminal N1 or N2, and phase L to
terminal L1 or L2 or L3.
Two-phase connection 400V~2P+N:
Place a terminal bridge between terminals L1 and L2, then between terminals N1 and N2.
Connect the earthing to the « earth » terminal, the neutral to terminal N1 or N2, phase L1 to
terminal L1 or L2 and phase L2 to terminal L3.
Three-phase connection 400V~3P+N:
Place a terminal bridge between terminal N1 and N2.
Connect the earthing to the « earth » terminal, the neutral to terminal N1 or N2, phase L1 to
terminal L1, phase L2 to terminal L2 and phase L3 to terminal L3.
Model 2 heating zones: 5IZ34291
Mains
230V~50/60Hz
( * ) as per standard EN 60 335-2-6
Caution! Insert the wires correctly and tighten the screws.
We are not responsible for incidents resulting from incorrect connections or non-existent or
inadequate ground connections.
Connection
1 phase + N
Diameter
3 x 1.5 mm²
31
Cable
Fuse
H 05 VV - F
16 A *
H 05 RR - F

Werbung

loading