Safety Tips
Whilst all care has been taken to remove sharp edges, care must be taken when
cleaning or handling to prevent risk of injury from exposed metal edges.
Do not overload the table top or shelf causing it to bend.
A whole piece instruction
1. Stainless Steel table Top x 1
2. Stainless steel Legs with Adjustable Feet x 4
3. Struts x 8 [ 4 pcs upper struts + 4 pcs Lower struts ]
Note: Be sure to check all packaging materials for any small parts that may have come
loose during transportation
Assembly Instructions
Fold Down Work Table
Assembly
1.
Remove all protective film, taking care to avoid scratching the surface.
2.
Place the shelf on its side on the floor. [Fig.1]
3.
Raise left hand side( Struts is shorter on this side ) legs first then raise the right hand side
( Struts is longer on this side ) legs, by pulling up and out from the centre of the table, into the
upright position.[Fig.2 and 2.2]
4.
Knock the struts at both left and right hand sides in upward direction[Fig.3and 3.3]
5.
Turn the table over,straight up the legs, then tighten all nylock nuts and lock the safety buckle
on struts.
[Fig.4]
Note: Adjust the feet if necessary to level the table.
Before using for the first time we recommend the table is cleaned thoroughly with a suitable cleaning
agent. Remove all cleaning residues and dry thoroughly.
Fig.1
Fig.3
Cleaning
Clean the table regularly using a cleaning agent suitable for use with stainless steel and galvanised
surfaces.
Always remove cleaning agents residues, this can discolour the surface.
Never leave any surface damp as this may cause discolouration.
Fig.2
Fig.2.2
Fig.3.3
Fig.4