Quick Start Guide
Resistance Thermometer for
Cold Junction Compensation
KC-CJC-***
Pepperl+Fuchs GmbH
Lilienthalstrasse 200
68307 Mannheim, Germany
Tel. +49 621 776-0
Document No.: 45-4314
Fax +49 621 776-1000
Edition: 12/2013
Copyright Pepperl+Fuchs
www.pepperl-fuchs.com
Installation
To operate this resistance thermometer with a temperature converter, the
terminal block at terminals 1 and 2 must be replaced with a terminal block with
a test socket. For operation with cold junction compensation, use terminal block
KC-STP-BU or KC-STP-GN.
In the case of temperature converters equipped with spring terminals, the
terminal block at terminals 3 and 4 must be replaced with a terminal block with
screw terminals and no test socket. Terminal blocks KC-ST-5BU and
KC-ST-5GN are available as accessories.
Replacing the terminal block and connecting the cable
1. Loosen the terminal screws on the terminal block (1) housing terminals 1
and 2.
2. Pull the conductor (5) out of the terminal block (1).
5
1
3. Remove the terminal block (1).
1
4. Fit the terminal block with test socket (2).
ENG
Use the blue terminal block KC-STP-BU for applications involving devices
in the hazardous area.
Use the green terminal block KC-STP-GN for applications involving devices
in the safe area.
2
5. Insert the conductor (5) into the terminal block (2).
5
2
6. Tighten the terminal screws on the terminal block (2).
Connecting the resistance thermometer
1. Loosen the terminal screws on the terminal block (3) housing terminals 3
and 4.
2. Insert the resistance thermometer (4) into the terminal block (3).
4
3.
2.
2
3
3. Position the upper pin in the test socket on terminal 2 on the
terminal block (2).
4. Tighten the terminal screws on the terminal block (3) housing terminals 3
and 4.
The resistance thermometer (4) is installed.

Werbung

loading

Inhaltszusammenfassung für Pepperl+Fuchs KC-STP-BU

  • Seite 1 Quick Start Guide 4. Fit the terminal block with test socket (2). Connecting the resistance thermometer Use the blue terminal block KC-STP-BU for applications involving devices Resistance Thermometer for in the hazardous area. 1. Loosen the terminal screws on the terminal block (3) housing terminals 3 Cold Junction Compensation and 4.
  • Seite 2 Kurzanleitung 4. Stecken Sie den Klemmenblock mit Prüfbuchse (2) auf. Widerstandsthermometer anschließen Verwenden Sie den blauen Klemmenblock KC-STP-BU für Anwendungen Widerstandsthermometer für mit Geräten im explosionsgefährdeten Bereich. 1. Lösen Sie die Klemmschrauben am Klemmenblock (3) mit den Klemmstellenkompensation Klemmen 3, 4.

Diese Anleitung auch für:

Kc-stp-gn