Commissioning

6
Commissioning
Prerequisite for commissioning is a complete installation of all hydraulic and
electrical components.
6.1

Commissioning the product

EKSRDS2A is filled via the filling and flushing valves at the flow meter.
1. Verify tightness of the components of the system.
- Adapt the test pressure and the test duration to the corresponding
installation and the corresponding operating pressure.
2. Set to ball valves to 45° position for filling of the system.
Thermometer ball valves
Operating and installation instructions
16
Normal operation:
Ball valve open in direction of flow of solar liquid
90°
Maintenance:
Ball valve closed
45°
Commissioning, filling, venting, draining and flushing:
Both ends open (gravity brake not active)
EKSRDS2A
DAIKIN Solar pressure station
4P699231-1 – 2022-06